- 
                        
                        
                        It needs to attach the supporting documents which are described to fill out the blanks in the prior permission form.
                         
- 
                        
                        
                        It will take at least 1 week to 2 weeks for licence application at the Division of Atomic Energy.
                         
- 
                        
                        
                        Filtches for Veneer are as follows;- A straight sawn log, cutting in quarter sawn form.- A sawn log, Slicing by band-saw evenly from one surface to another- a sawn log, there is a little wane on the touch of two surface- a sawn log, slicing on two surface with cross saw cutting in a rectangular form
                         
- 
                        
                        
                        Director
General is the only person who sign the documents and there is no authorized
representative to sign the documents. (Ministry of Education > Department of Research and Innovation > Division of Atomic Energy)  
                         
- 
                        
                        
                        Division of Atomic Energy will inform to applicant by phone. Also, the applicant can
call to office to inquire application status. (Ministry of Education > Department of Research and Innovation > Division of Atomic Energy) 
                         
- 
                        
                        
                         You
can attend the Radiation Protection training that organized by Division of
Atomic Energy. (Ministry of Education > Department of Research and Innovation > Division of Atomic Energy)